Building Law Monthly
Crystallisation of disputes
In
MW High Tech Projects UK Ltd v Balfour Beatty Kilpatrick Ltd [2020] EWHC 1413 (TCC) O’Farrell J held that the claimant was not entitled to a declaration that an adjudicator lacked jurisdiction
to decide the dispute which had been referred to him on the ground that no dispute had crystallised between the parties. The
claimant’s challenge was based on a report which it claimed introduced new issues and to which it had not had the time to
respond. O’Farrell J held that the issues raised in the report were not materially different to the claim which had already
been made by the defendant and in relation to which a dispute had already crystallised by virtue of the claimant’s failure
to respond to the claims made by the defendant.