JCT Contract Administration
Page 233
Index
Index
- acceleration 82, 85, 90, 96
- accepted defects 63
- additions (variations) 70, 76, 81, 86, 161
- adjudication (in disputes) 64, 74, 83, 97, 139, 173, 174, 180, 184, 186, 188, 191–203, 231
- Administrator (in liquidations) 116, 117
- advance payment 61, 66, 156, 221, 222
- advance payment bond 221, 222
- all risks (insurance) 149, 151, 153, 154, 221
- approximate estimate 19, 221, 225
- approximate quantities 14, 54, 77, 82, 84, 221, 228
- arbitration 4, 94, 99, 177, 180–185, 188. 3, 97, 102, 184, 186, 187–193, 197
- architect's satisfaction 78, 171
- arithmetical check 45
- articles of agreement 42, 49, 52
- assignment 177
- attendance claims 106
- averaging (of insurance claim) 154, 222
- back-to-back (contract terms) 137, 141, 222
- balance of adjustable work 168
- bankruptcy 109, 115, 116, 118
- base date 164–167
- battle of the forms 140, 141
- BIM Protocol 4, 48, 52, 206, 220
- binding resolution (of disputes) 184, 185, 188
- brief (from client) 10, 11, 15, 43, 52, 224
- buildability 33, 34, 222
- builders quantities 6, 222
- building information modelling 4, 51, 205–220
- building regulations 7, 79, 172, 178
- building standards 25, 39, 79
- building surveyor(s) 2, 52, 152, 155
- business risk insurance 153
- cash flow 1, 43, 44, 46, 47, 226
- caveat emptor (in buying buildings) 126
- CDP Analysis 48, 76
- chain of liability 125, 128, 130, 138
- changes (variations) 73, 79, 80, 165
- CIMAR (Construction Industry Model Arbitration Rules) 192, 193
- CIS (Construction Industry Tax Deduction Scheme) 191
- civil engineer 6
- claims (contractual) 3, 65, 67, 71, 78, 80, 82, 85, Chapter 6
- claims made (basis for insurance) 152
- clerk(s) of works 171, 177, 179, 223
- Code of Practice for testing work 170, 175, 179
-
Page 234
- competent person in charge 170
- completion bill (of quantities in liquidations) 119
- completion date 77, 82, 88–90, 92–94, 96, 98
- conceptual design 11
- conciliation 184, 185, 192
- concurrent delay 105, 223
- concurrent expense 105, 223
- conditions of contract 42, 49, 213, 224
- consensual resolution (of disputes) 184
- consideration 37, 98, 128, 141, 184, 185, 221, 230
- Construction Act 64, 66, 67, 71, 78, 92, 139, 140, 150, 180, 181, 186, 188, 191, Chapter 13, 223, 225, 226, 228, 231
- CDM (Construction Design and Management Regulations) 52, 223
- construction management 7, 17, 22, 33, 35, 119, 196
- consultant architect 11, 21, 32, 170, 209, 210, 216
- contra proferentum (interpretation of indemnity clauses) 145
- contract bills of quantities 48, 49, 50, 222
- contract document 48, 78, 222
- contract drawings 48, 49, 89
- Contract Particulars 42, 55, 62–66, 87–91, 94, 96, 105, 129, 141, 146, 148, 152, 157, 158, 163–167, 191, 192, 208, 212, 224
- contract specification 80
- contract sum 54, 55, 59, 73, 76, 77, 78, 84, 85, 90, 91, 95, 96, 97, 103, 123, 133, 147, 150, 151, 154, 155, 164, 169, 174, 175, 178, 180, 222, 224
- contract sum analysis (CSA) 52, 53, 67, 79, 97, 220
- contractor designed portion (CDP) 48, 75, 76, 129, 141, 152, 171, 172, 208, 209, 210, 211, 224
- contractor's proposals 48, 52, 53, 75, 79, 80, 179, 180, 220, 224
- core (tests) 179
- cost plan (cost planning) 15, 45, 224
- cost reimbursement 8, 17, 119, 120
- cover pricing 26, 224
- creditors 59, 115, 116, 121, 122
- critical path 105
- CSCS (Construction Skills Certification Scheme) 177
- cube test(s) 178, 179, 181, 224
- date for completion 88, 90, 92–94, 96, 100, 105
- date of possession 87, 105
- daywork(s) 56, 77, 82, 111, 165, 224
- deed (contracts) 50, 79, 127, 152
- default (of parties to contract) 111, 112, 114, 133, 137, 141, 147, 150, 152, 156, 157, 162, 164, 192, 201
- defect(s) 3, 12, 23, 63, 66, 78, 89, 91, 110, 111, 120, 125–130, 134, 138, 156, 157, 171, 174, 177, 180, 227, 230
- defective work 64, 67, 83, 106, 137, 138, 180
- deferment 91, 103
- deferred (possession) 91
- defined work 78, 81, 225
- delay(s) 20, 48, 65, 87, 89, 92–94, 98–102, 104–106, 114, 120, 124, 128, 131, 133, 137, 138, 141, 153, 155, 170, 175, 178, 223
- delay notice 92
- design, manage and construct 20, 21, 35, 60
- detailed design 6, 11, 12, 13, 14, 34, 169, 198, 219, 224
- discounted cash flow 225, 229, 232
- dispute prevention mechanisms 184
- disputes adviser 188
- disputes board 188
- disturbance (of regular progress) 98, 102, 103
- domestic subcontractor 133
- drawing and specification contracts 9, 12, 13
- due date 62, 78, 92, 199–202, 225, 226, 228
- due diligence 40, 45, 225
- early use 89, 95, 153, 154
-
Page 235
- electronic data exchange (in BIM) 214
- elemental cost breakdown 52
- elemental format (of final account) 82
- employer's final statement 80, 90, 231
- employer's requirements 48, 52, 53, 57, 67, 75, 79, 80, 89, 129, 133, 138, 141, 146, 147, 180, 208, 220
- end-point financing 60
- errors 14, 28, 29, 31, 43–47, 50, 75
- estimated prime cost (EPC) 19, 20, 22, 225, 227
- estimating 7, 8, 14
- ex-gratia claims 98
- exclude individuals (from works) 170, 177
- existing structure 114, 149
- expert determination (of disputes) 184–186
- express terms 59, 74, 87, 97, 150
- extension contracts 27–29, 35
- extension(s) of time 3, 77, 78, 79, 82, 87–94, 96, 99, 102, 104, 105, 163, 170, 175, 202
- facilities management 9, 231
- factor cost 32, 54, 55, 100, 156, 161, 162, 164, 167, 226
- fair assessment 82
- fair valuation 76, 102, 226, 229, 232
- fast-tracking 1
- federated model (in BIM) 4, 209
- final adjustment 90, 91
- final certificate 74, 78, 80, 83, 90, 92, 127
- final account Chapter 4, 45, 54, 61, 90, 120, 123, 124, 147, 226, 227, 229, 231
- final date for payment 62, 78, 199–202, 226, 228
- final payment 3, 13, 78, 83, 92, 169, 171, 174, 180
- final statement 80, 90, 231
- financial adjustment 79, 175
- financial statement 84
- fixed fee 18, 19, 35
- fluctuations Chapter 10, 3, 71, 83, 85
- form of tender 40
- formula fluctuations 162, 167, 168
- framework agreement 30, 31, 35
- FRI lease (full repairing and insuring lease) 126, 226
- front load(ing) 44, 46, 226
- frustration 110
- fundamental breach (of contract) 109–111
- implied term(s) 73, 74, 97, 178, 226
- indemnity Chapter 9, specifically 143–146
- index, indices for price adjustment 167, 168
- information management (in BIM) 57, 208, 220
- information requirements (in BIM) 208, 209, 212, 213, 215, 217
- insolvency Chapter 7, 3, 140, 143, 147, 155, 180, 202, 216
- Insolvency Act 115, 116, 118, 124
- instructions 40, 63, 74, 75, 80, 81, 94, 95, 98, 101, 170, 171, 175, 176, 179
- insurance Chapter 9, 3, 13, 14, 42, 49, 51, 57, 59, 63, 66, 68, 89, 95, 113, 114, 117, 118, 120, 198, 221, 222, 227, 231
- interest charges 98, 101
- interim application (for payment) 67
- interim certificate(s) 14, 62, 64–66, 103, 150, 156
- interim payment(s) Chapter 3, 15, 42, 56, 110, 121, 156, 157, 173, 174, 180, 200, 223, 226, 230
- interim valuation(s) 61, 62, 64, 67, 84
- invitation(s) 24, 25, 37–40, 51, 139
-
Page 236
- latent defects 3, 12, 23, 125, 128, 129, 130, 227
- letter of acceptance 42
- levels of detail (in BIM) 209, 210
- life-cycle costs 51
- limitation period 50
- limitation of liability (clauses in material supply contracts) 128
- Limited Liability Partnerships Act 115
- liquidated damages 42, 62, 66, 78, 87, 89, 91, 92, 95, 96, 99, 153, 174, 180
- liquidation 59, 98, 116–118, 120–123, 144, 145
- litigation 97, 184, 187–190, 192
- local authority/local authorities 7, 9, 148
- loss adjustment 155
- loss and expense 63, 65, 77, 78, 98, 103–105, 113, 162, 163
- loss of profit 47, 98, 100, 101, 102, 114, 115
- lump sum 8, 9, 12, 16, 17, 18, 20, 21, 23, 38, 40, 59, 78, 99, 119, 120, 161, 229
- making good defects 78, 177
- management contracting 8, 20, 22, 35
- materials off site 63, 65, 121, 153
- materials on site 63, 64, 65, 67, 70
- measured term contract(s) 9, 15, 16, 35, 228, 230
- measurement and valuation 61, 62, 67, 76, 77, 79, 229
- mediation 139, 174, 180, 184–188, 190, 192, 193
- most economically advantageous tender (MEAT) 51, 53, 227
- mutual dealing (in liquidations) 117, 121, 227
- named sub-contractor 133, 138, 141, 227
- negligence 3, 79, 115, 131, 145, 146, 151, 154
- negotiated contract 24, 28, 30, 32, 33, 35
- negotiating claims 104
- negotiation 1, 11, 31–34, 51, 54, 55, 56, 83, 103, 119, 183, 184, 226, 228
- neutral evaluation 184, 185
- New Rules of Measurement (NRM) 38, 56, 81, 167, 178
- no negligence (insurance) 146
- nominated sub-contractor 133, 137, 227
- notional account (in liquidations) 120, 227
- notional cost(s) 19, 101, 121, 227
- notional quantities (with measured term contracts) 16, 228
- novated sub-contractor 134
- novation (in liquidations) 118, 119, 228
- novation (of designers) 11, 52, 53, 228
- off-site overheads 61, 99, 100, 166
- off-site payment bonds 156, 157, 158
- omissions 76, 85, 93, 102
- on-demand bond 156, 221, 230
- on-site overheads 99, 166
- open book (negotiation) 33, 51, 54, 56, 57, 228
- open tender 24
- ordering of materials (in claims) 101
- outline design 11, 224
- owner (of building) 6, 42, 121, 125–127, 129, 137, 144, 149, 231
- ownership of materials 71, 117, 118, 121, 122, 140, 230
- parametric (modelling of building work) 205
- parent company guarantee 156
- parity of tendering 42, 43, 228
- partial possession 88, 89, 95, 153
- partnering 1, 24, 29, 30, 31, 33, 35, 51, 228
- partners (in partnering) 30
- partners (business) 115
- partnership(s) (business) 115, 116, 124
- pay less notice 62, 66, 78, 92, 139, 201, 202, 228
- pay when certified (terms in contracts) 195, 200, 203
- pay when paid (terms in contracts) 200
-
Page 237
- performance specification 10, 11, 24, 228
- permitted purpose (in BIM) 211, 215
- personal injury (insurance) 145, 146
- photographs 84
- planning permission 7, 11, 52
- post-contract 13, 14, 46, 48, 50, 53, 55, 133, 138, 179, 209, 221
- post-tender checks 25, 41, 44, 228
- postponement 91
- Practical Completion 63, 66, 81, 87–91, 94, 95, 153, 169, 171, 174, 180, 221
- pre-tender checks 26, 27, 229
- preambles 39, 222
- preferred bidding 47, 48, 228
- preliminaries (preliminary items) 39, 42, 55, 56, 65, 67–69, 78, 82, 99, 101, 143, 153, 178, 222, 225, 229, 230, 232
- price manipulation 43, 45
- price ringing 26, 229
- prime cost 19, 20, 22, 61, 225, 227
- private finance initiative (PFI) 9, 10, 35, 51, 60, 61, 231
- pro-rata rates 76, 226, 229, 232
- procurement Chapters 1 and 2, 2, 3, 60, 74, 112, 119, 159, 231
- professional (expert) client 147, 208, 226, 229
- professional indemnity insurance (PII) 3, 13, 14, 152, 159, 198
- project agreement (in BIM) 211
- project manager 7, 34
- property damage/damage to property (insurance) 145, 146, 147, 153, 158
- provisional sum(s) 55, 78, 81, 82, 84, 133, 147, 163, 218, 222, 225, 227, 229, 232
- public liability insurance 153
- pure design and build 10, 11, 24, 60, 219
- re-measurement 14
- re-rating 77, 102, 229
- rectification period 78, 89, 91, 177, 180
- reductions 47, 67, 83, 222
- relevant event(s) 92–95, 104, 105
- relevant matter(s) 103, 104, 105
- relevant omission 93
- remoteness of damages 114
- removal of work 170, 175
- rescission 98, 110
- reservation of title (building materials on/off site) 65, 121, 127, 140, 230
- retention 63, 65, 66, 71, 91, 95, 123, 140, 156–158, 174, 180, 230
- retention bond 63, 66, 157, 158, 230
- reverse auctioning 47, 230
- Schedule 2 (variation/change) 77, 79, 80, 83, 84, 94, 165
- Schedule 2 (acceleration) 85, 96
- Schedule 2 (named sub-contractor) 133, 138
- schedule(s) of rates 4, 16, 52, 53, 67, 79, 80, 97, 99, 219, 224, 230
- scheme for construction contracts 186, 191, 198, 199, 202, 203
- seasonal effect 100
- sectional completion 88, 89
- selective tendering 26, 27, 29, 30, 40, 41, 43, 44
- self-employed (sub-contractors) 132
- serial tendering 28–30, 51
- services engineer(s) 6, 129, 152, 209, 218
- set-off 78, 92, 138–140, 180, 201, 226
- shoe stepping (in taking action for latent defects) 130
- single tender 31, 32, 35
- site minutes 74
- site overhead(s) 17, 20, 27, 61, 77, 99, 100, 106, 118, 166, 229, 230
- site survey(s) 38, 118
- slump tests 181, 230
- snagging (defects) 88, 131, 156, 171, 177, 180, 230
- soil investigations 39
- soil reports 38
- Special Project Vehicle(s) 60, 231
- specialists (contractors) 7, 8, 20–23, 125, 126–131, 133, 134, 137, 138, 141, 143, 171, 177, 218, 219, 227, 231
-
Page 238
- specified default 112
- specified peril 95, 99, 114, 149, 151, 155, 227, 231
- speculative pricing 43, 44, 46, 47
- stage payment(s) 60, 61, 64, 67, 174, 199
- standing list 25–27
- statutory adjudication 186, 195, 196, 231
- statutory insurance 153
- statutory requirements 172, 178
- strategic partnering 30, 33, 51
- structural engineer(s) 6, 75, 209–211
- subrogation 153, 154, 159, 231
- substitution 79
- suspend performance (under Construction Act) 63, 202
- taking off 7, 14, 81, 205
- target cost 17–19
- technical check 45
- tenant 3, 6, 42, 126, 128–130, 141, 149, 223, 231
- tender type(s) 8, 23
- tender adjudication 40
- tender documents 24, 39, 40–42, 46, 52–54, 218, 225, 228, 232
- tender drawings 39, 40
- tender ratio 25, 27, 232
- tender report 45
- terrorism/terrorist acts 113, 151
- tests 3, 63, 169, 170, 173, 175, 178, 179, 181
- Third Party Rights Act 128, 129, 141
- time-barred (action for redress for latent defects) 126, 127
- tort 79, 128, 130, 141, 152, 198
- trade contractor 134, 137
- traditional contracting 13
- traditional fluctuations 164, 166
- transfer payment 22
- transparency 22, 23, 51
- two stage tendering 24, 33–35, 51, 57
- undefined work 81, 232
- uneconomic use of labour/working of labour 98, 100, 106, 223
- uneconomic use of plant 101, 106
- uneconomic ordering of materials 101, 106
- valuation rules 76, 81, 82, 98, 232
- valuing (valuation of) variations 14, 76, 79, 102, 163, 230, 232
- variation (“Schedule 2”) quotation 76, 77, 79, 80, 83
- variation(s) 14, 43, 48, 50, 56, 60, 65, 67, 70, 73–84, 93, 94, 98, 101–103, 110, 115, 123, 124, 150, 152, 161–163, 165, 223, 230, 232
- VAT 164, 165, 191