Glossary

Glossary

Term Meaning Defined in Section
Abrahamson Principles Principles of fair and balanced risk allocation, articulated in Max W Abrahamson, 'Risk Management’ (1983) International Construction Law Review 241, 244. ¶4.7.1
ACE Association of Consulting Engineers (UK).  
ACTSC Supreme Court of the Australian Capital Territory. ¶34.2
adjudication A method of dispute resolution in which an independent Adjudicatoe resolves the dispute by providing a provisionally binding determination of the parties’ contractual rights following an impartial assessment of the parties’ submissions and other evidence.a ¶25.2
Adjudicator The independent person (Neutral) who carries out an adjudication. ¶25.2
ADR Alternative dispute resolution. ¶1.4
ADR clause An agreement by the contracting parties to adopt a specific form of ADR in the event of, or on the occurrence of, a dispute, and the contractual consequences of the decision of the independent Neutral. ¶25.5
APH Australian Parliament House in Canberra. ¶15.1
Architect See Engineer. ¶2.1
AS Australian Standard. ¶11.3.1
ASCE American Society of Civil Engineers. ¶3.6
Authority Lower Yarra Crossing Authority. ¶22.2.1
balance of representation In the context of writing an Australian Standard, balance of representation means: “The membership of a Standards Australia Committee is formally balanced as part of the constitution of the Committee to represent the broadest possible spectrum of stakeholder interests.” ¶10.2
BCA Building Code of Australia. ¶10.3

Page 528

Blue-Green Book
FIDIC Form of Contract for Dredging and Reclamation Works – First Edition 2006, Second Edition 2016. ¶11.3.1
bouleversement de l'économie du contrat Contractual equilibrium (France). ¶12.5.5
BWE Bucket wheel excavator. ¶10.8.1
CAR Contractor's All Risks (insurance policy). ¶23.3.2
CDB Combined Dispute Board. A Dispute Board under the ICC Dispute Board Rules that is primarily a DRB, but can be a DAB if the parties choose. ¶25.5
CDM Construction (Design and Management) Regulations 1994 (UK). ¶20.8.4
CISG United Nations Convention on Contracts for the International Sale of Goods. Also known as the Vienna Convention. ¶36.12
clean expert An independent expert who is not a member of the legal team. ¶31.3
Code See Code of Practice. ¶10.2.1
Code of Practice “A publication describing good practice. It does not have the force of law unless quoted as having such in the relevant regulations.”b ¶10.2.1
Concept Design Drawings Drawings of the design prepared by Leighton Contractors Pty Ltd for the Bass Highway project and included in its tender submitted to the State of Tasmania. ¶17.3
consensus In the context of writing an Australian Standard: “General agreement, characterised by the absence of sustained opposition to substantial issues by any important part of the concerned interests and by a process that involves seeking to take into account the views of all parties concerned and to reconcile any conflicting arguments.”c ¶10.2
contract A legally binding agreement in which each party accepts obligations in exchange for rights granted by the other party in order to achieve the contract objective. ¶4.2
Contract The construction contract being referred to. ¶1.1
Contract Administrator The Engineer or Employer's Representative administering a FIDIC contract. ¶29.6.2
Contract E The work of completion and erection of the steel spans of the West Gate bridge under a “cost plus” labour management contract, not including fabrication and subassemblies of the steel boxes. ¶22.2.2

Page 529

Contract S
The original contract for fabrication and erection of the steel box girder spans of the West Gate bridge. ¶22.2.2
Contractor The party to a construction contract (the Contract) who carries out the work. ¶1.1
construction contract Any contract where one person (including a corporation) agrees for valuable consideration to carry out construction of a physical structure (including building or engineering works) for another. ¶1.1
construction failures Failures of buildings or engineered facilities that involve collapse of structures or result in loss of life. ¶20.1
Construction Manager The Contractor in a construction management contract who has contractual responsibility for programming and coordinating the design and construction activities. ¶5.6
contractual adjudication Adjudication of a dispute pursuant to the parties’ agreement to implement the agreed procedure in a contract. ¶25.2
contractual expectations The contracting parties’ expectations of their rights and obligations based on the terms of the contract, objectively determined. ¶4.2
COVID-19 requirements COVID-19 specific mandatory requirements introduced by governments. ¶12.3
CRB Country Roads Board (Victoria). ¶16.3.1
CRW CRW Joint Operation - a tripartite joint operation established under the laws of the Republic of Indonesia, comprising three Indonesian contractor companies. One of the parties in the Singapore High Court and Singapore Court of Appeal cases between PT Perusahaan Gas Negara (Persero) TBK and CRW Joint Operation. ¶27.4.2
CTR Cost, time and resources schedule, a formal tool to plan, manage and report cost, time and resources on a task by task basis in a consulting engineer's assignment. ¶31.6.1
CTV Building in Christchurch that collapsed in the February 2011 earthquake, with the loss of 115 lives. ¶18.1
D&C Design and construct (contract). ¶26.2
DAAB A Dispute Avoidance/Adjudication Board. ¶24.5
DAB A Dispute Adjudication Board. ¶24.5
DB A Dispute Board. ¶25.4
DCM Design, construct and maintain (contract). ¶26.2

Page 530

DCOM
Design, construct operate and maintain (contract). ¶26.2
design All plans, drawings, sketches, instructions, and descriptions that determine the way the Works (or parts of it) are to be constructed. Design includes the writing or selection of specifications as well as the production of plans and drawings and any element of choice on the part of the designer, such as requirements as to materials or working methods. ¶5.2
design contract A contract for the preparation of a design to be constructed under a construction contract. ¶1.1
design life The expected service life that results from the design process. ¶7.9
design working life “Duration of the period during which a structural element, when designed, is assumed to perform for its intended purpose with expected maintenance but without major structural repair being necessary.”d ¶7.9
design parameters The required functions, service life and assumptions made for the design of a facility. ¶7.2
determination A category of DR in which a Neutral assesses the facts and the law in relation to a specific dispute and provides a reasoned determination on how the dispute is to be resolved according to the parties’ legal rights. Determination methods include binding expert determination, arbitration and litigation. ¶30.2
DIER Department of Infrastructure, Energy and Resources, Tasmania. ¶17.1
Direction The instruction issued to the Contractor on behalf of the DIER to design and build the Bass Highway in cut 1.5m deep opposite Hagley House. ¶17.1
dirty expert An expert consultant who is a member of the legal team. ¶31.3
Dispute Avoidance/Adjudication Board A standing Dispute Board appointed under a 2017 FIDIC Contract to assist the parties in avoiding disputes, and to provide a provisionally binding decision on a dispute referred to it; if neither party issues a notice of dissatisfaction within a defined time, the decision becomes final and binding. ¶24.5

Page 531

Dispute Adjudication Board
A Dispute Board that provides a provisionally binding decision on a dispute referred to it; if neither party issues a notice of dissatisfaction within a defined time, the decision becomes final and binding. ¶24.5
Dispute Board A panel of one or three suitably qualified and experienced independent persons appointed under the Contract to be available to confer with the parties to assist in the avoidance of disputes or if necessary, to provide a determination of a dispute referred to it.

The rest of this document is only available to i-law.com online subscribers.

If you are already a subscriber, click Log In button.

Copyright © 2024 Maritime Insights & Intelligence Limited. Maritime Insights & Intelligence Limited is registered in England and Wales with company number 13831625 and address 5th Floor, 10 St Bride Street, London, EC4A 4AD, United Kingdom. Lloyd's List Intelligence is a trading name of Maritime Insights & Intelligence Limited.

Lloyd's is the registered trademark of the Society Incorporated by the Lloyd's Act 1871 by the name of Lloyd's.