Delay and Disruption in Construction Contracts
Page 762
17
Disruption to progress and lost productivity
Page 763
Introduction
Page 763
“All too often in construction, the terms ‘productivity’ and ‘production’ are used interchangeably. This is, however, incorrect. Production is the measure of output (ie, things produced) whereas productivity is the measurement of the production.”1