i-law

Delay and Disruption in Construction Contracts


Page 762

17

Disruption to progress and lost productivity


Page 763

Introduction

“All too often in construction, the terms ‘productivity’ and ‘production’ are used interchangeably. This is, however, incorrect. Production is the measure of output (ie, things produced) whereas productivity is the measurement of the production.”1

The rest of this document is only available to i-law.com online subscribers.

If you are already a subscriber, click Log In button.

Copyright © 2024 Maritime Insights & Intelligence Limited. Maritime Insights & Intelligence Limited is registered in England and Wales with company number 13831625 and address 5th Floor, 10 St Bride Street, London, EC4A 4AD, United Kingdom. Lloyd's List Intelligence is a trading name of Maritime Insights & Intelligence Limited.

Lloyd's is the registered trademark of the Society Incorporated by the Lloyd's Act 1871 by the name of Lloyd's.