i-law

Remedies in Construction Law


Page 227

CHAPTER 16

The problem of “global” claims

The problem of “global” claims

16.1 Construction contracts frequently produce difficult problems of the causative impact of numerous events acting simultaneously or sequentially, causing delay, disruption and expense. Contractors often argue that separating out and identifying individual events and tying those events to specific effects, be the effect delay, disruption or expense, is impossible or impractical. Employers often contend in response that the contractor must do just that – identify the event relied upon, the contractual basis for claim, and the consequence of the event. In front of courts or arbitrators the cry will come from the employer that the claim put forward is underparticularised and should be regarded as an impermissible “global claim”, a “total cost claim” or a “total time claim”. Sometimes the contractor is capable of better particularising the claim but wishes for tactical reasons not to do so. Sometimes it simply is impossible for the contractor to do so. Very often the reality lies somewhere in between these two positions.

The rest of this document is only available to i-law.com online subscribers.

If you are already a subscriber, click Log In button.

Copyright © 2024 Maritime Insights & Intelligence Limited. Maritime Insights & Intelligence Limited is registered in England and Wales with company number 13831625 and address 5th Floor, 10 St Bride Street, London, EC4A 4AD, United Kingdom. Lloyd's List Intelligence is a trading name of Maritime Insights & Intelligence Limited.

Lloyd's is the registered trademark of the Society Incorporated by the Lloyd's Act 1871 by the name of Lloyd's.